EAST AFRICA'S GOLD PROCESSING AUTHORITY

Powering Sustainable
Industrial Growth.

Specialist engineering consultancy dedicated to the design, construction, and optimization of gold processing plants — including turnkey Carbon-in-Pulp (CIP) and Carbon-in-Leach (CIL) systems, equipment supply, and genuine spares.

Turnkey CIP/CIL EPC
Bondo–Nango HQ & Plant
Migori Spares Branch
94%+ Recovery Targets
Metallurgical Hydrocyclone Classification Circuit
LIVE METALLURGICAL CALCULATOR Bondo Metallurgy Lab
Current Circuit Recovery90.0% AuTarget with CIL optimization: 95.5% Au
250 TPD
3.50 g/t
0.35 g/t
Recoverable Gold Delta+46.4 oz / month
Estimated Revenue Unlock+$123,007 / mo
Run Full 4-in-1 Suite
20+

Professional Staff

Metallurgists, Process Engineers & Fabricators

5+

Years Experience

Gold Processing & CIP/CIL Engineering

50+

Projects Delivered

Plants Designed, Constructed & Upgraded

30+

Happy Mining Clients

Across Kenya & East Africa

Who We Are

Engineering Excellence in
Gold Processing.

Green Ngoria Supplies Ltd is a specialist consultancy company dedicated to the design, construction, and optimization of gold processing plants across East Africa.

Headquartered in Bondo–Nango with an operational spares and reagents branch in Migori, we bridge the gap between metallurgical science, structural fabrication, and on-site operation. We ensure your ore yields maximum gold output with optimal reagent consumption and zero unnecessary downtime.

Specialized Gold Processing Metallurgy

Flowsheet design, diagnostic bottle roll tests, cyanidation kinetics, and counter-current carbon adsorption optimized for your specific ore body.

Local Spares & Reagents Hub in Migori

Warehoused high-chrome slurry pump wear parts, activated carbon, and process reagents stocked locally for immediate dispatch.

Turnkey EPC & Commissioning Guarantee

From engineering drawings to concrete pouring, tank erection, piping, and first-gold smelting — executed with uncompromising quality and HSE standards.

What We Do

Our Services & Engineering Capabilities

Comprehensive, connected gold processing solutions across every stage of the mining project lifecycle.

The Plant Lifecycle

One integrated system.
Every stage connected.

Whether developing a new gold circuit or debottlenecking an operating plant, our workflow aligns engineering rigor with capital efficiency and recovery guarantees.

01

Feasibility Study

Ore characterization, diagnostic leach kinetics & CAPEX/OPEX modeling.

02

Plant Design

Custom PFDs, P&IDs, equipment sizing, mass balance & 3D plant layout.

03

Equipment Sourcing

Precision tank fabrication, slurry pumps, ball mills & carbon delivery.

04

Construction

Civil foundation, structural tank erection, slurry piping & electricals.

05

Commissioning

Dry/wet testing, cyanide circuit startup, elution tuning & first gold pour.

06

Plant Optimization

Ongoing recovery audits, tailings grade monitoring & spares support.

PROPRIETARY CYANIDATION & ADSORPTION TECHNOLOGY

Turnkey Carbon-in-Pulp (CIP) & Carbon-in-Leach (CIL) Plants

From primary crushing and ball milling through cascade adsorption, interstage wedge-wire screening, pressurized Zadra elution, electrowinning, and induction gold smelting.

Engineered Scale • 10 to 2,500+ TPD

Tailored Industry Solutions

Engineered gold processing plants scaled to ore volume, mineralogy, and capital parameters.

10 – 50 TPD88% – 94% Au Recovery

Small Scale Mining

Artisanal & Modular Skid-Mounted Gold Plants

Engineered for artisanal cooperatives and small concession holders requiring high-efficiency modular CIP/CIL gold extraction with low initial capital and rapid on-site commissioning.

Throughput10 to 50 TPD
DeploymentRapid 4-Week Setup
  • Primary jaw crushing unit with vibrating grizzly feeder for -20mm primary discharge
  • Compact overflow rubber-lined ball mill with closed-circuit spiral classifier or mini cyclone
  • Centrifugal gravity gold concentrator for early coarse free-gold capture (up to 40% gravity recovery)
50 – 500 TPD92% – 96% Au Recovery

Medium Scale Mining

Commercial Semi-Automated CIP/CIL Leaching Plants

Full-scale commercial plant engineering, automated leaching circuits, continuous carbon regeneration, and reliable spares support to ensure maximum runtime and recovery.

Throughput50 to 500 TPD
Deployment24/7 Continuous Operation
  • Two-stage closed-circuit crushing: Primary jaw crusher + secondary cone crusher with vibrating sizing screen
  • Heavy-duty continuous overflow ball mill with hydrocyclone cluster classification loop
  • Dual trash screens to prevent wood fibers and oversized debris from entering carbon adsorption train
500+ TPD94% – 97.5% Au Recovery

Large Scale Mining

Enterprise & Industrial Turnkey EPC Mining Facilities

End-to-end turnkey EPC delivery, automated SCADA process monitoring, high-rate thickening, advanced elution/electrowinning, and long-term metallurgical partnerships.

Throughput500 to 2,500+ TPD
DeploymentFull SCADA & EPC Delivery
  • Heavy-duty 3-stage crushing circuit with secondary & tertiary cone crushers and triple-deck vibrating screens
  • Dual-stage grinding: SAG mill or primary heavy-duty ball mill followed by regrind circuit with closed-circuit cyclone clusters
  • High-rate pre-leach thickener with automated flocculant dosing to achieve steady 48% solids feed to leaching train
+5% to +18% Au+5% to +18% Au Recovery Uplift (Target Tailings < 0.15 g/t Au)

Plant Optimization & Turnaround

Diagnostic Audits, Tailings Recovery & Circuit Debottlenecking

Comprehensive diagnostic audits, kinetic leach profiling, carbon circuit remediation, and mechanical retrofits for operational plants suffering from gold loss, carbon fouling, or bottlenecks.

ThroughputApplicable to any operational plant from 25 to 2,000+ TPD
DeploymentRapid Diagnostic Audit
  • Comprehensive on-site diagnostic sampling and mass balance audit across all grinding, leaching, and elution stages
  • Grind size liberation profiling (P80 calibration) and hydrocyclone apex/vortex tuning to eliminate coarse gold loss
  • Activated carbon kinetic testing, activity restoration, and attrition minimization protocols
View Full Mining Scale Comparison Matrix
Proven Field Results

What Our Clients Say

Trusted by commercial mine operators and directors across Kenya and East Africa.

94.5% Au Recovery Achieved

Green Ngoria transformed our mining operation with a state-of-the-art CIP plant. Their expertise, precision fabrication, and commitment to quality is unmatched in East Africa.

JO
James OchiengMining Operations ManagerSiaya Gold Operation
On-Time Commissioning

From our initial ore feasibility study to plant commissioning in Migori, the engineering team delivered beyond our expectations. Reliable, technically sound, and always responsive.

SW
Sarah WanjiruProject DirectorMigori Gold Ventures
+15.2% Recovery Boost

Their diagnostic plant audit and carbon circuit optimization increased our gold recovery by 15.2%. The return on investment was realized within the first two months of operation.

PK
Peter KamauChief Executive OfficerBondo Mining Co.
Interactive Engineering Tool

What is your plant
telling you?

Calculate your gold recovery efficiency, tailings revenue leakage, and required leach tank volumes in real time. Submit your plant parameters for a preliminary review by our metallurgists.

METALLURGICAL AUDIT PREVIEWv2.4
Feed Head Grade3.50 g/t Au
Gold Recovery Target94.2%
Circulation Residence Time24.0 Hours
Your Next Plant Decision

Ready to Maximize Your
Gold Recovery?

Partner with East Africa's leading gold processing consultancy. Reach out to our engineering desks in Bondo-Nango and Migori today.