Gold Processing Engineering Capabilities

Gold Processing Plant Design, Construction & Optimization

From metallurgical bottle-roll testing and flowsheet simulation to turnkey EPC construction, CIL tank trains, pressure Zadra elution skids, and on-site recovery audits across East & Central Africa.

100 – 2,500 TPDPlant Sizing RangeSmall, medium & commercial scale
88% – 96% AuTarget Recovery RateVerified via diagnostic testwork
Turnkey EPCSingle-Source DeliveryDesign, fabrication & commissioning
24/7 HotlineOperational SupportMigori spares hub & Bondo HQ
Displaying 7 of 7 engineering domains
Gold Processing Plant Design
01 / PROCESS ENGINEERINGProcess Engineering

Gold Processing Plant Design

Custom-engineered plant layouts optimized for maximum gold recovery, energy efficiency, and scalability across small, medium, and large mining operations.

The Engineering Challenge:

Every ore body possesses distinct mineralogy, hardness (Bond Work Index), and leach kinetics. Generic or off-the-shelf plant flowsheets result in sub-optimal gold recovery, excessive reagent wastage, and frequent mechanical bottlenecks.

Throughput Range100 – 2,500 TPD
Recovery Target88% – 96% Au
Engineering OutputPFD, P&ID & 3D GA
StandardsISO & SABS Certified
Key Engineering Deliverables:
  • Process Flowsheets (PFDs) & Mass/Water Balance Calculations
  • Civil, Structural, Piping & Mechanical Plant Layout Drawings
  • Complete Equipment Sizing, Duty Data Sheets & Technical Specifications
  • Capex/Opex Estimates, Payback Analysis & EPC Implementation Roadmap
Carbon-in-Pulp (CIP) Systems
02 / GOLD RECOVERY CIRCUITSGold Extraction Circuits

Carbon-in-Pulp (CIP) Systems

Turnkey CIP cascade system design, tank fabrication, dual-hydrofoil agitator installation, and carbon management for high-efficiency gold adsorption.

The Engineering Challenge:

Improper agitator selection, poor interstage screen maintenance, and carbon attrition from violent shear cause severe gold loss into tailings and excessive activated carbon consumption.

Typical Recovery92% – 96.5% Au
Residence Time24 – 36 Hours
Carbon Loading> 3,500 g/t Au
Carbon Attrition< 40 g/t Ore
Key Engineering Deliverables:
  • Turnkey CIP Cascade Circuit Engineering Package
  • Heavy-Duty Leach & Adsorption Tank Fabrications
  • 316L Interstage Screen & Carbon Transfer Air-Lift Systems
  • Carbon Management, Acid Wash & Reactivation Protocols
Carbon-in-Leach (CIL) Systems
03 / INTEGRATED EXTRACTIONGold Extraction Circuits

Carbon-in-Leach (CIL) Systems

Simultaneous cyanidation leaching and activated carbon adsorption engineered for high-recovery processing of preg-robbing, organic carbon, and clay-rich gold ores.

The Engineering Challenge:

Ores containing naturally occurring organic carbon or reactive clays suffer from severe preg-robbing if leaching occurs prior to carbon contact, irreversibly locking dissolved gold in tailings.

Preg-Robbing Offset+8% – 15% Au Boost
Dissolved O28 – 12 ppm Sparged
Carbon Tenor12 – 20 g/L Slurry
Tank Train6 – 8 Stages
Key Engineering Deliverables:
  • CIL Process Flowsheet & Tank Train Sizing Calculations
  • Preg-Robbing Mitigation & Carbon Kinetic Profiling
  • Agitation, Oxygen Sparging & Slurry Transfer Systems
  • Site Commissioning & Plant Operations Manuals
Plant Optimization & Upgrades
04 / OPERATIONAL PERFORMANCEPerformance & Audits

Plant Optimization & Upgrades

Rigorous on-site metallurgical audits, circuit debottlenecking, and mechanical upgrades to recover locked gold, reduce reagent expenditure, and eliminate downtime.

The Engineering Challenge:

Operating plants frequently suffer from unexplained gold leakage in tailings (>0.4 g/t Au), carbon fouling/passivation, chronic slurry pump blowouts, and throughput limitations below nameplate capacity.

Recovery Boost+4% – 12% Au
Reagent Savings15% – 30% NaCN/Lime
Tailings Target< 0.15 g/t Au
Turnaround Time5 – 10 Days on Site
Key Engineering Deliverables:
  • Certified Metallurgical Audit & Mass Balance Report
  • Tailings Gold Loss Remediation & Kinetic Roadmap
  • Chemical & Reagent Expenditure Reduction Protocols
  • Mechanical Equipment Retrofit & Flowsheet Upgrades
Commissioning & Installation
05 / SITE EXECUTIONSite Execution & Erection

Commissioning & Installation

Professional on-site mechanical, electrical, instrumentation, and metallurgical commissioning ensuring plants start safely and achieve target gold recovery from day one.

The Engineering Challenge:

Unsupervised plant startups frequently lead to severe equipment misalignment, pump cavitation, slurry pipe blockages, cyanide leaks, motor burnouts, and costly operational delays during initial ramp-up.

Ramp-Up Duration7 – 14 Days to Target
Safety RecordZero LTI Cyanide Standard
First Bullion PourVerified On-Site
Operator TrainingFull Staff Certified
Key Engineering Deliverables:
  • Certified Cold & Hot Commissioning Sign-Off Certificates
  • Plant Operating Standard Operating Procedures (SOPs)
  • Punch List Resolution & As-Built Handover Dossier
  • Local Operational & Maintenance Team Training Program
Technical Consultancy
06 / ADVISORY & EXPERTISEAdvisory & Due Diligence

Technical Consultancy

Independent engineering advisory, technical due diligence, equipment specification reviews, and operational troubleshooting for mine owners and financial institutions.

The Engineering Challenge:

Mine owners, investors, and boards face high financial stakes and require unbiased, experienced metallurgical advice prior to committing major capital to plant acquisitions or expansions.

Due Diligence100% Bankable & Impartial
Audit ScopeGeology to Bullion Pour
ConfidentialityFull Non-Disclosure Agreement
CoverageEast & Central Africa
Key Engineering Deliverables:
  • Independent Metallurgical Opinion & Audit Reports
  • Root-Cause Failure Analysis & Engineering Action Plans
  • Operational SOPs, Maintenance Schedules & Safety Manuals
  • Board-Level Technical Due Diligence Dossiers
Feasibility Studies & Economic Modeling
07 / PROJECT PLANNINGAdvisory & Due Diligence

Feasibility Studies & Economic Modeling

Bankable technical and economic feasibility assessments supporting capital raising, mineral resource conversion, and low-risk gold processing plant construction.

The Engineering Challenge:

Commencing mining operations and plant construction without rigorous metallurgical testwork, mass balancing, and financial modeling leads to severe cost overruns, wrong flowsheet selection, and premature project failure.

Study StandardsNI 43-101 / JORC Aligned
Financial ModelingNPV, IRR & Sensitivity
Testwork DepthBottle Rolls & Diagnostic
Decision Timeline4 – 8 Weeks
Key Engineering Deliverables:
  • Scoping & Bankable Feasibility Study (BFS) Reports
  • Certified Metallurgical Testwork Data & Leach Kinetic Curves
  • Comprehensive Capex, Opex & Payback Financial Cash-Flow Models
  • Project Risk Matrix, Infrastructure Plan & Execution Timeline

The Green Ngoria 5-Stage Turnkey EPC Delivery Process

Every processing plant we construct follows a rigorous, milestone-driven engineering protocol that mitigates risk, accelerates startup, and guarantees recovery benchmarks.

01

Ore Characterization & Testwork

Bottle-roll cyanide kinetics, diagnostic leach profiling, Bond Work Index comminution testing, and settling rate analysis in our metallurgy lab.

Lab Validation
02

Flowsheet & Plant Design

Detailed Process Flow Diagrams (PFD), Piping & Instrumentation Diagrams (P&ID), mass balances, 3D mechanical general arrangements, and civil foundation calculations.

Engineering Packages
03

Fabrication & Procurement

Heavy tank rolling, dual-hydrofoil agitator shaft fabrication in Bondo, Zadra elution columns, and procurement of Ultra-Chrome slurry pumps.

Heavy Works Yard
04

Civil, Mechanical & Electrical Erection

On-site structural steel erection, tank placement, slurry piping manifolds, reagent dosing lines, and motor control center (MCC) electrical wiring.

Site Construction
05

Cold/Hot Commissioning & Bullion Pour

Water runs, slurry loop testing, cyanide dosing calibration, carbon loading tracking, Zadra stripping, and metallurgical verification at the first doré bullion pour.

Recovery Sign-Off
Transform Your Gold Processing Operation

Ready to optimize your flowsheet or construct a new plant?

Consult with our principal process metallurgists in Bondo or Migori to review your ore assays and formulate a high-recovery plant design.