
Feasibility Studies & Economic Modeling
Bankable technical and economic feasibility assessments supporting capital raising, mineral resource conversion, and low-risk gold processing plant construction.
Why standard off-the-shelf solutions fail in mining.
Commencing mining operations and plant construction without rigorous metallurgical testwork, mass balancing, and financial modeling leads to severe cost overruns, wrong flowsheet selection, and premature project failure.

Our Engineering & Delivery Approach
We combine analytical process modeling with hands-on site metallurgy to achieve verified operational results.
Laboratory metallurgical testwork: diagnostic cyanidation, bottle-roll kinetic curves, comminution testing, and settling rate analysis.
Conceptual flowsheet development, trade-off studies (CIP vs CIL vs Heap Leach vs Gravity-Flotation), and equipment sizing.
Detailed Capex, Opex, sustaining capital, NPV, and IRR financial cash-flow modeling across multiple gold price scenarios.
Risk assessment, water/power supply infrastructure planning, tailings dam design, and NEMA environmental compliance.
What You Receive: Certified Engineering Packages
Green Ngoria produces bankable, construction-ready engineering deliverables signed off by certified process engineers and metallurgists.
Engage Our Engineering Desk
Have an active mining project, low recovery plant, or new feasibility study? Speak directly with our lead metallurgists in Kenya.


